Featured Biomass Gasification Project: Greenhouse

Featured Biomass Gasification Project - Alternative Energy Solutions
USING BIOMASS
Capital Required
Yes
$ 1,204,000
Contingency
5%
$ 60,200
Total Capital & Contingency  
$ 1,264,200
Capital Structure    
Project Debt
70%
$ 884,940
Project Equity
30%
$ 379,260
Capital Required for initial build
and Expansion
$ 379,260
Annual Debt Expense
(9% Interest)
20 Year Project Lifetime
$96,942.06
O&M    
Plant Related O&M  
$60,000
Fuel Costs Annual  
$100,000
Total O&M  
$60,000.00
Total Annual Cost of Operations  
$256,942.06
USING CONVENTIONAL NATURAL GAS
Facility Equipment    
Capital Required
Yes
$ 40,000
Contingency
5%
$ 2,000
Total Capital & Contingency  
$ 42,000
Capital Structure    
Project Debt
70%
$ 884,940
Project Equity
30%
$ 379,260
Capital Required for initial build
and Expansion
$ 42,000
Annual Debt Expense
(9% Interest)
20 Year Project Lifetime
$96,942.06
O&M    
Plant Related O&M  
$5,200
Fuel Costs Annual  
$1,013,459
Total O&M  
$1,018,659

 

Case History AES-HW2

Highlights:
Looking for alternatives to rising natural gas prices, the grower learned of the available MSW. Because manual recycling is performed the paper wastes are easily obtained. Because the material will be received at moisture contents above 50% (dry), grinding will be performed followed by drying using flue gas heat. Screening will be included to remove any occasional non combustible.

Facility:
Twenty Acre Commercial Greenhouse With Access To MSW
(Paper & Cardboard)

Issue: Using two 500 bhp hot water boilers, 10 years old, static for 3 to 4 years. Assume re-energize cost of NG boilers, retube, cleaning ($40,000), Annual NG Cost ~ $1,013,459, Annual O&M ~ $5,200, Useful Life ~ 20 YRS,

Opportunity Biomass Fuel: MSW (Paper & Cardboard)

Solution: Add one 450 bhp Modular Hot Water Gasifier, delivering 16,000,000 btu/hr. CAPX ~ $1,234,000, Annual NG Cost (backup) ~ $100,000, Annual O&M ~ $60,000, Useful Life 40 YRS. Retain one traditional boiler for backup and peak loads.

Technologies: Grinder, Screen, Flue Gas Dryer, Uniconfort, Modular 3 Pass Alternative Fuel Gasifier/Boiler.

Solution: The grower utilizes a central plant for hot water production. Using one 450 bhp alternative energy boiler, the central plant will be modified. One of the two exisiting natural gas boilers will remain for surge and emergency backup.

Equipment Parameters
Generator: Model Global G 400
Heat Duty:
(nominal) 15 MMBtuhr
Pressure: (nominal) Atmospheric

Fuel Feed
Rate Average: 2400 lb/hr
Fuel metering bin: 3 yd3 (140 ft3)
Gross Storage: Two room Bunker

Ash
Ash Density: (Est) 39 lbs/ ft3
Ash Generation Rate: 13% of feed rate